Saint Simons Island House

Exterior under construction

We always love seeing our designs come to life. It is fun to go back to preliminary design drawings and compare to construction photos. Some houses go through many iterations of preliminary design before the owners are completely satisfied. This one is not much different than the first sketches drawn.

St Simons House

tile tub

Tile installation is in progress. The tile on the right, in the master shower, is by Alyse Edwards, its part of the “Wanderlust” Collection, see more here.

Maple interior trim is nearly complete (click above photos to enlarge)

We are excited to see this project coming together. It is about 70% complete.

Fripp Island

Piers, Fripp Island

On Fripp Island, foundation work is underway. The footings are poured and the CMU piers are going up. A retaining wall of piles is installed. See the preliminary design for this house on the boards here.

Under Construction
Retaining wall
Beach front, Fripp Island

It is a treat getting to go to the beach for site visits!

Long Cove Club Renovation

Our major renovation in Long Cove Club, on Hilton Head Island is very close to completion. We love happy clients, and these clients are thrilled with how their house has been renovated to suit their family’s lifestyle and design preferences.

Hilton Head Island Renovation
Back porch
Pool Broad Creek View

The outdoor living on the rear of the house and the pool, with views over Broad Creek are pretty spectacular!

We will have more houses under construction to show you soon!